Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-4. High pressure cutout switch and hot gas bypass solenoid valve, removal and installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Figure  5-4.  High  pressure  cutout  switch  and  hot  gas  bypass   solenoid    valve,    removal and   installation. c. Removal. (4)  Recheck  system  suction  pressure  after (1) Remove top  cover  from unit (para  3-6). proper charging. (2)   Discharge   refrigerant   (para   6-1). (3)   Refer   to   figure   3-14   and   remove   the 5-13. Thermostatic Expansion Valves back  pressure  regulating  valve. a.   General.   A   l-ton   thermostatic.   expansion d. Installation. valve  controls  the  flow  of  liquid  refrigerant  into (1)   Install   the   back   pressure   regulating the evaporator coil during the cooling cycle.  The valve and top cover by reversing the order of re- ½-ton   thermostatic   expansion   valve   functions moval. (2)  Replace  the  dehydrator (3)  Evacuate  and  recharge system   (para   6-1). when the unit is in the bypass cycle. Each expan- (para   5-17). sion valve is provided with a superheat setting to the   refrigerant insure  the  operating  efficiency  of  the  refrigerant system. 5-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business