4120-01-091-9672">

 

Click here to make tpub.com your Home Page

Page Title: PURGING THE REFRIGERANT SYSTEM.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-339-14
f.
Refer to figure 4-3 and open valve VA at point 4 and valve V6 at point 2.
g. Connect the nitrogen line to the tubing at point 1 and release nitrogen into the system for approximately 5
minutes or until moisture ceases to be discharged from the system.
h. Energize the liquid line solenoid valve by applying 24 volts dc across pins M and N of plug P10.
i.  Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from
the system.
j.
Remove the nitrogen line from the tubing at point 1 and connect it to the suction pressure service valve V6 at
point 2.
k.  Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from
the system.
l.  De-energize the liquid line solenoid valve and release nitrogen into the system for approximately 5 minutes or
until moisture ceases to be discharged from the system.
m. Remove the nitrogen line from the valve at point 2 and connect it to the discharge pressure service valve VA
at point 4.
n. Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from
the system.
o. Energize the pressure equalizer solenoid valve K4 by applying 24 volts dc across pins C and F of plug P10.
p. Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from
the system.
q. Remove the nitrogen line from the valve at point 4 and connect it to the tubing at point 3.
r.  Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from
the system.
s.  De-energize the pressure equalizer solenoid valve and release nitrogen into the system for approximately 5
minutes or until moisture ceases to be discharged from the system.
t.  Remove the nitrogen line from the tubing at point 3 and cap tubing at points 1 and 3 until installation of a new
u. Close valves V1 and V6.
v. Refer to figure 4-16 and install a new dehydrator.
4-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business