4120-01-091-9672">

 

Click here to make tpub.com your Home Page

Page Title: PRESSURE RELIEF VALVE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-339-14
4-13.
PRESSURE RELIEF VALVE.
a. Inspection.
(1) Turn the selector switch to the "OFF" position and disconnect the air conditioner from the electrical power
source.
(2) Refer to figure 3-13 and partially remove the junction box.
(3) Refer to figure 4-10 and inspect the pressure relief valve externally for obvious defects.
(4) Refer to paragraph 4-4c and check the pressure relief valve for refrigerant leaks. Refer to paragraph 4-4d
and repair any leaks found.
b. Replace. If damage or defects are found which could impair serviceability, replace the pressure relief valve.
Refer to steps c and d for removal of defective valve and the installation of a new valve.
c.
Removal.
(1) Refer to figure 4-2 and release refrigerant from the system.
(2) Refer to figure 4-10 and remove the pressure relief valve.
d. Installation.
CAUTION
Use care in applying leak lock to the threads of the pressure relief valve so that
none of the material gets into the refrigerant system when the valve is installed.
(1) Apply leak lock (National Stock Number 8030-00-999-6313) or equivalent to the threads of the pressure
relief valve.
(2) Refer to figure 4-10 and install the pressure relief valve.
(3) Perform any further maintenance on refrigeration components required.
(4) If no further maintenance of refrigeration components is required, refer to paragraph 4-8 and purge the
refrigerant system.
(5) Refer to paragraph 4-4c and check the pressure relief valve and the dehydrator for refrigerant leaks.
Refer to paragraph 4-4d and repair any leaks found.
(6) Refer to figure 4-4 and evacuate the refrigerant system.
(7) Refer to paragraph 4-10 and charge the system with refrigerant.
(8) Refer to figure 3-13 and install the junction box.
4-23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business