4120-01-091-9672">

 

Click here to make tpub.com your Home Page

Page Title: Installation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-339-14
(g) Energize the pressure equalizer solenoid valve by applying 24 volts dc across pins C and F of plug
P10.
(h) Release nitrogen into the system for approximately 5 minutes or until moisture ceases to be
discharged from the system.
(i) Remove the nitrogen line from the tubing at point 2 and connect it to the tubing at point 5. Release
nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from the system.
(j) De-energize the pressure equalizer solenoid valve and release nitrogen into the system for
approximately 5 minutes or until moisture ceases to be discharged from the system.
(k) Remove the nitrogen line from the tubing at point 5 and connect it to the tubing at point 4. Release
nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from the system.
(l) Remove the nitrogen line from the tubing at point 4 and connect it to the valve at point 6. Release
nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from the system.
(m) Remove the nitrogen line from the valve at point 6 and connect it to the valve at point 3. Release
nitrogen into the system for approximately 5 minutes or until moisture ceases to be discharged from the system.
(n) Remove the nitrogen line from the valve at point 3.
(o) Close valves V1 and V6.
(p) Cap all open tubing until installation of new components.
f.
Installation.
(1) Refer to figure 3-13 and connect plug P10 (3) to receptacle J10 (4) on the junction box.
(2) Refer to figure 4-16 and install a new dehydrator.
(3) Refer to figure 4-18 and install a new compressor.
(4) Refer to figure 3-13 and install the junction box.
(5) Refer to figure 4-4 and evacuate the refrigerant system.
(6) Refer to paragraph 4-10 and charge the system with refrigerant. Leave the pressure gages connected.
(7) Connect the unit to an appropriate electrical power source, turn the selector switch to the "COOL"'
position and the thermostat control knob counter-clockwise to its limit.
(8) Refer to paragraph 4-4c and check the system for refrigerant leaks.
4-45

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business