Click here to make tpub.com your Home Page

Page Title: Expansion Valve and Refrigerant Piping (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-341-13
Q-Quarterly
W-Weekly
Expansion Valve
Align holes in left side panel
7
q
with holes in housing. Secure
i
and Refrigerant
left side panel with seventeen
Piping (continued )
(17) screws.
Align holes in right side panel
with holes in housing. Secure
right side panel with seventeen
(17) screws.
Align holes in top rear panel
with holes in housing. Secure
top rear panel with nine (9)
screws.
Align holes in top front panel
with holes in housing. Secure
top front panel with seven (7)
screws.
Align holes in top center panel
with holes in top front and top
rear panels. Secure top center
panel with ten (10) screws.
NOTE
The sight glass maybe inspected
by looking through the louvers
in the left side panel. If you
cannot see the sight glass
through the left side panel, then
remove the rear panel.
4-20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business