|
|
TM 5-4120-341-13
Q-Quarterly
W-Weekly
Expansion Valve
Align holes in left side panel
7
q
with holes in housing. Secure
i
and Refrigerant
left side panel with seventeen
Piping (continued )
(17) screws.
Align holes in right side panel
with holes in housing. Secure
right side panel with seventeen
(17) screws.
Align holes in top rear panel
with holes in housing. Secure
top rear panel with nine (9)
screws.
Align holes in top front panel
with holes in housing. Secure
top front panel with seven (7)
screws.
Align holes in top center panel
with holes in top front and top
rear panels. Secure top center
panel with ten (10) screws.
NOTE
The sight glass maybe inspected
by looking through the louvers
in the left side panel. If you
cannot see the sight glass
through the left side panel, then
remove the rear panel.
4-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |