|
|
TM 5-4120-341-13
REMARKS
ACTION
LOCATION/lTEM
LEFT SIDE OF HOUSING
a.
Test start capacitor with a suitable capacitor
3. Start Capacitor
tester for continuity, leakage short, and
The start capacitor is rated at 500
b.
microfarads, 125 volts AC.
Replace start capacitor if testing indicates
c.
that it is d efective.
INSTALLATION
4. Start Capacitor
a.
Connect electrical leads to start capacitor and
remove tags.
b.
Cover electrical leads with cap.
Install start capacitor in bracket.
c.
a.
5. Left Side Panel
Align holes in left side panel with holes in
housing.
b.
Secure left side panel with seventeen (17)
screws.
4-64
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |