|
|
TM 5-4120-352-14
OPERATION UNDER USUAL CONDITIONS
Section III.
NOTE
2-7.
General
When vent damper door is open to admit fresh air,
a. The instructions in this section are published
partially close evaporator inlet louver to balance in-
for the information and guidance of the personnel
coming air. Keep vent or damper door closed during
responsible for the operation of the air conditioner.
heavy rain.
b. The operator must know how to perform every
b. Starting Instructions for Cooling. Start
operation of which the air conditioner is capable.
the air conditioner for cooling as shown in figure 2-
This section gives instructions on starting and stop-
4.
ping the air conditioner, and detailed operating in-
c . Operating Instructions for Cool-
structions. Since nearly every condition presents a
ing. Operate the air conditioner for cooling as
different problem, the operator may have to vary
shown by figure 2-5.
the given procedure to fit the condition.
d. Starting Instructions for Heat-
2-8
Starting and Operating In-
shown in figure 2-6.
e. Operating Instructions for Heat-
structions.
a. Preparation for Starting.
shown in figure 2-7.
(1) Perform the daily preventive maintenance
f. Operating Instructions for Venti-
service (para 3-4).
lation. Operate the air conditioner for ventilation
(2) Connect the main power cable.
as shown by figure 2-8.
(3) Check drain holes to insure that they are
open.
2-9.
Stopping Instructions
(4) Be sure the unit is firmly secured.
9.
air conditioner to clear condenser opening.
b. Perform the daily preventive maintenance
service (para 3-4).
2-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |