4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: Table 3-1. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
Table 3-1. ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS) (cont.)
Item
Item To Be
No.
Inspected/Serviced
Procedures
22
Operational Checks
a. Be sure the mode selector switch is in the OFF position.
CAUTION
If military operational considerations allow the time, it will
help extend the life of the compressor if the air conditioner
is not turned on for its check of operation in the COOL
mode until after a sufficient time to eliminate any danger of
liquid refrigerant accumulation in the compressor. Except
in extremely cold conditions, if input power has been
disconnected for a period of less than six hours, an equal
warm-up period is desirable. If the disconnected period has
been more than six hours, a full six-hour warm-up period is
recommended.
b. Perform functional check of the air conditioner in all operational modes in
accordance with the instructions in paragraph 2-4.
23
Run Indicator Light
a. Light should be illuminated in all operating modes.
b. Light may also be checked with MODE SELECTOR SWITCH in OFF
position. Push in. Light should light.
c. Replace bulb if necessary. (See para 3-30.)
3-18 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business