4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: Table 4-1. TROUBLESHOOTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
Table 4-1. TROUBLESHOOTING (cont.)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 5.
Check that AC power is being supplied.
WARNING
The following test must be conducted with the power on.
Exercise extreme
caution.
(a) Disconnect power cable at washboard connector on front of shelter.
REMOTE CONTROL CABLE IDENTIFICATION
AT WASHBOARD
(W86-P1 CURBSIDE CABLE)
(W88-P1 ROADSIDE CABLE)
POWER CABLE IDENTIFICATION AT WASHBOARD
(W22-P1 CURBSIDE CABLE)
(W21-P1 ROADSIDE CABLE)
(b) Apply power.
(c) Trip and reset circuit breaker.
(d) Check for nominal 208 Vac between pins AB, AC, BC of washboard connector.
If 197 to 229 Vac is not present in all three phases refer problem to shelter maintenance
personnel.
Step 6.
Check thermal protector circuit of switch 6 (in evaporator blower motor B3).
(a) Remove power.
(b) Measure resistance between connector contacts B and N of remote cable at washboard or P14
behind remote control assembly.
4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business