TM 5-4120-359-14
Line up the holes in the gasket, connector, and evaporator housing.
Using a screwdriver, socket and ratchet, install the four screws and lock nuts.
Reconnect the P9A plug from inside the access box.
(3) Connect the P9 plug and harness to the J9 thru-bulkhead connector.
(4) To install the P4 to J7 wiring harness:
Connect the P4 plug to J4 on the electrical module.
Reconnect the two quick-disconnect terminals to the air temperature sensing probe.
NOTE
At this point, all connections should be complete except for J7 and P8. They will
be reconnected when the radio frequency filter and front cover are installed.
Follow-on Procedures: 1. Install radio frequency filter and front evaporator cover. (See paragraph 4-17.)
2. Install top evaporator cover. (See paragraph 3-21.)
3. Install access cover. (See paragraph 3-14.)
4. Install air conditioner on shelter. (See paragraph 3-6.)
4-47
|