4120-01-069-1321)">
|
|
TM 5-4120-359-14
(4) To remove P10, P11, and P13 harness:
Disconnect P10 connector plug from compressor.
Disconnect P11 connector plug from fan motor.
Disconnect P13 connector plug from back of condenser electrical module.
Tag and remove leads to terminal board TB4, switches S4 and 55 and solenoid valves L1 and L2.
(5) To remove lead S4 to S5:
Tag and remove.
b. Inspect/Test
(1) Check connectors for general condition, loose, broken, or missing contact. Replace connectors if damaged.
(2) Check individual wires for loose solder connections, cut or frayed insulation, and cut or broken wires.
(3) See wiring diagram, figure 4-3, and continuity test individual wires. Repair or replace wires with no continuity.
c.
Repair
(1) See paragraph 4-3 for general wire repair instructions.
(2) See table 4-2, Wire List, for wire lengths and terminals information when individual wires are replaced.
d. Installation
(1) To install P9A wiring harness:
Connect P9A to J9 at evaporator access box.
See tags, wire marking, and wiring diagram figure 4-3.
Install leads on terminal board TB4 and ground E3. Remove tags.
Using screwdriver and wrench install clamp, screw, and nut. (Also holds P2 harness.)
(2) To install P2 wiring harness:
Connect P2 to J2 at evaporator access box.
See tags, wire marking, and wiring diagram figure 4-3.
Install leads on terminal board TB4 and ground E3. Remove tags.
Using screwdriver and wrench, install clamp, screw, and nut. (Also holds P9A harness.)
(3) To install P12 wiring harness:
Connect P12 to J12 on back of condenser electrical module.
See tags, wire marking, and wiring diagram figure 4-3. Install leads on terminals board T34 and ground
E3. Remove tags.
4-121
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |