4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: CONDENSER HOUSING ASSEMBLY INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
NOTE
If any refrigeration piping was disconnected with the compressor being replaced,
transfer the piping to the replacement compressor before installing it in the air
conditioner.
(1) Side compressor into condenser housing.
(2) Install compressor mounting hardware per paragraph 4-87.
(3) Wrap wet rags around compressor at connection points and while brazing direct flame away from
compressor.
(4) While purging the system with nitrogen, braze the tubing joints. (See paragraphs 4-6 and 4-7.)
(5) Replace the dehydrator. (See paragraph 4-73.)
(6) Connect electrical connector plug (P10) to connector J10) on compressor terminal box.
(7) Leak test all newly connected joints and those in the repair area. (See paragraph 4-8.)
(8) Evacuate and charge the refrigerant system. (See paragraphs 4-9 and 4-10.)
Follow-on Procedures: 1. Install left end condenser cover. (See paragraph 3-27.)
2. Install top condenser cover. (See paragraph 3-25.)
3. Install air conditioner on shelter. (See paragraph 3-6.)
4-89. CONDENSER HOUSING ASSEMBLY INSPECTION
a. Check for broken welds, badly bent or dented parts, and cracked or broken parts.
b. Check that plate nuts and blind nuts are in place and secure.
c.
Refer repairs to general support maintenance.
4-90. ELECTRICAL MODULE ASSEMBLY, CONDENSER SECTION (REMOVAL/INSTALLATION)
Preliminary Procedures: Disconnect power.
Change 2 4-183

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business