Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-9. Liquid sight indicator removal and installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4120-361-14 1. Brazing operations should be carried out using approved eye protection equipment and rods not containing cadmium. 2. Certain brazing operations may require mechanical venti- lation. 3. Local preventive medicine personnel should be queried if doubt exists as to rod compo- sition or ventilation require- ments. (2) Refer to paragraph 5-6 and sol- der the liquid sight indicator to the refrigerant system tubing. (3) Refer to para 5-6 and leak test the refrigeration system. (4) Refer to figure 6-1 and purge the refrigeration system. (5) Refer to figure 4-9 and in- stall the counterclockwise rotation con- denser fan assembly and fan mounting bracket. (6) Refer to figure 4-4 and in- stall the rear top cover. Figure  5-9. Liquid sight indicator removal and installation 5-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business