Click here to make tpub.com your Home Page

Page Title: LIQUID LINE AND PRESSURE EQUALIZING SOLENOID VALVES (L1) , (L2) - Continued.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-369-14
LIQUID LINE AND PRESSURE EQUALIZING SOLENOID VALVES (L1) , (L2) - Continued.
5-21.
Installation.
c.
(1) Refer to figure 5-5 and mount solenoid on compartment wall.
Blazing operations should be carried out using approved
eye protection equipment and rods not containing cadmium.
Certain brazing operations may require mechanical ventilation.
Local preventive maintenance personnel should be questioned
if doubt exists as to rod composition or ventilation requirements.
(2) Install coil to valve.
(3) Refer to paragraph 5-6 and solder solenoid valve to refrigerant system tubing.
(4) Refer to paragraph 6-3 and leak test the refrigerant system.
(5) Refer to paragraph 6-3 and purge the refrigeration system.
(6) Refer to paragraph 4-18 and install top covers.
Caution should be exercised with fluorocarbon refrigerant
gas (freons) as they can displace oxygen and thereby
cause suffocation.
Personnel with a history or other evidence of cardiac
rhythm abnormalities should be made aware of the
potential for aggravation of existing cardiac rhythm
abnormalities or the induction of arrhythmias, as a
result of exposure to flourocarbon refrigerant gases
(freon).  Such individuals should be evaluated by
local medical authorities before working in environments
where potential freon exposure may occur.
(7) Refer to paragraph 6-3 and charge refrigerant system.
5-18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business