|
|
TM 5-4120-369-14
ACCUMULATOR - Continued
5-23.
(1) Refer to paragraph 6-3 and discharge the refrigerant system.
(2) Refer to paragraph 4-18 and remove top covers.
(3) Refer to figure 5-7 and unsolder system tubing from acumulator.
(4) Remove two screws and washers holding accumulator bracket.
Remove accumulator.
(5) Remove nut to seperate accumulator from bracket.
Brazing operations should be carried out using approved
eye protection equipment and rods not containing cadmium.
Certain brazing operations may require mechanical ventilation.
Local preventive medicine personnel should be queried
if doubt exists as to rod composition or ventilation
requirements.
Installation
b.
(1) Mount bracket on accumulator.
(2) Refer to figure 5-7 and install accumulator secure with washer and lock nut.
(3) Refer to paragraph 5-7 and solder system tubing to accumulator.
(4) Refer to paragraph 6-3 and leak test the refrigeration system.
(5) Refer to paragraph 4-18 and install top cover.
(6) Refer to paragraph 6-3 and purge the refrigerant system.
(7) Refer to paragraph 6-3 and charge refrigerant system.
5-22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |