Click here to make tpub.com your Home Page

Page Title: TESTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-374-13
ACTION
REMARKS
LOCATION/lTEM
a. Remove two (2) screws securing compressor cover to
3. Cover Compressor
compressor.
b. Remove cover from compressor to expose start capacitor
and start relay.
Death or serious injury may occur if capacitor is not discharged prior to
removal.
Remove two (2) hex nuts to loosen capacitor from bracket.
4. Start Capacitor
a.
Remove cap from start capacitor.
b.
c.
Discharge start capacitor.
Tag and disconnect electrical leads from start capacitor.
d.
LEFT SIDE OF HOUSING
a. Test start capacitor with a suitable capacitor tester for
5. Start Capacitor
continuity, leakage short, and capacitance.
b. The start capacitor is rated at 189 to 227 microfarads,
220 volts AC.
c. Replace start capacitor if testing indicates that it is defective.
a. Connect electrical leads to start capacitor and remove tags.
6. Start Capacitor
b. Cover electrical leads with cap.
c. Install start capacitor in bracket using two hex nuts.
7. Start Capacitor Cover a. Align two holes on compressor cover with holes on compressor.
b . Secure cover with two screws.
a. Align holes in left side panel with holes in housing.
8. Left Side Panel
b. Secure left side panel with seventeen (17) screws.
4-51

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business