Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-374-13
5-14. EXPANSION VALVE (CONT)
REMARKS
ACTION
LOCATION/lTEM
TOP AND RIGHT SIDE OF HOUSING
a. Align holes in return air grill with holes in front panel.
9. Return Air Grill
b. Secure return air grill to front panel with eight (8) screws.
a. Align holes in right side panel with holes in housing.
10. Right Side Panel
b. Secure right side panel with seventeen (17) screws.
a. Align holes in top front panel with holes in housing.
11. Top Front Panel
b. Secure top front panel with seven (7) screws.
Refer to paragraph 5-7 and charge refrigerant system.
12. Refrigerant
Servicing
a. Align holes in top center panel with holes in top front and
13. Top Center Panel
top rear panels.
b. Secure top center panel with ten (10) screws.
5-38

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business