| |
TM5-4120-375-14
SECTION
PREPARATION FOR STORAGE OR SHIPMENT
4-25 Preparation For Storage
VI
Make sure the power supply is off at the
disconnecting the power supply line.
source before
The air conditioner is prepared for storage or movement
the following:
1.
Turn off electrical power supply to air conditioner
power cable from unit.
by performing
and disconnect
2.
Remove the external power connector and secure to inside of the
maintenance panel.
3.
Prepare the air conditioner assembly for storage in accordance with
TM-740-90-1.
4-26
Shipment
CAUTION
Keep unit vertical.
1.
Short Distance Movement
Lift unit at base with a forklift or carry unit to new worksight using
lifting rings on top of unit.
2.
Long Distance Movement
Crate the air conditioner, providing adequate protection for panels
and control box.
Refer to TM 38-250 for crate job.
Provide suitable blocking and tie downs to prevent unit from shifting
during transfer.
4-134
|