Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SET UP
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-375-14 5-21. SET UP. Prepare the air conditioner for pressure-testing as shown below. and as directed in accordance with paragraph 5-21 steps a thru g. a. b. c. d. e. f . g. Make sure that the return air damper is completely closed, and that the fresh air damper is open. Hang an accurate thermometer directly in front of fresh air damper to register,"dry bulb return air temperature. Hang an accurate thermometer directly in front of guard, making sure that the thermometer is shaded light, to record "outdoor ambient temperature”. the evaporator to unit, the condenser coil from direct sun- Loosen eight turnlock fasteners (1) securing maintenance panel (2) to left side panel (3). Remove maintenance panel. Connect a refrigeration service manifold to the suction and dis- charge    service   valves,   purging   the   manifold   of   any   air   trapped in the lines. If indoor ambient temperature is too low, provide a space raise the “dry bulb to return air to unit" temperature to heater to 80 degrees F (27 degrees-C). 5-22

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business