| |
TM5-4120-375-14
PRESSURE SWITCH (CONT.)
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
10. Front Panel
a.
Align holes in front panel with holes in frame.
b.
Secure front panel (4) to frame with thirty-four
screws (5) and two screws (6).
11. Control Box
a. Align holes in control box (3) with holes in front
panel.
b.
Secure control box with four screws (2)
and four screws (l).
12. Pressure Test
Pressure test air conditioner in accordance with
paragraphs 5-19 thru 5-24.
5-34
|