Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION II. SERVICE UPON RECEIPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-375-14 SECTION II. SERVICE UPON RECEIPT 4-4. UNLOADING THE EQUIPMENT. The crated air conditioner may be unloaded and moved by any means, provided the unit weight is supported by the base platform. 4-5. UNPACKING THE EQUIPMENT. CAUTION So that the unit is protected,    it should be left crated until moved to the location where it is to be installed. a. General. To uncrate the unit,   remove the bands from the top panel and lift off the top. Remove sides in a similar manner. The unit is then ready for inspection. b. Depreservation. Prepare the air conditioner for inspection and operation as outlined on DA Form  2258 (depreservation  Guide  for  Vehicles  and  Equipment. 4-6. INSPECTING  AND  SERVICING  EQUIPMENT. a. Inspect  the  entire  air  conditioning  unit,  including  motors,  fans, controls, etc.,   to be certain that all parts have been received and without damage. Report  any  deficiencies  to  the  proper  maintenance level. CAUTION Do not remove tags from equipment until the instructions have been followed.  Failure  to  follow  these  instructions  can  result  in  serious damage to the equipment. b. Test the joints in the refrigerant circuit for leaks in accordance with  paragraph  5-17. 4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business