| |
TM5-4120-376-14
SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
4-27. PREPARATION FOR STORAGE.
WARNING
Make sure the power supply is off at the source before disconnecting the power
supply line.
The air conditioner is prepared for storage or movement by performing the following:
a. Turn off electrical power supply to air conditioner and disconnect power cable from unit.
b. Prepare the air conditioner assembly for storage in accordance with TM-740-90-1.
4-28. SHIPMENT.
CAUTION
Keep unit vertical.
a. Short Distance Movement. Lift unit at base with a forklift or carry unit to new worksight
using lifting rings on the sides of unit.
b. Long Distance Movement. Crate the air conditioner, providing adequate protection for
panels and control box. Refer to TM 38-250 for crating information. Provide suitable blocking
and tie downs to prevent unit from shifting during transfer.
4-171/(4-172 Blank)
|