Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-376-14 SECTION  V.  MAINTENANCE  PROCEDURES 4-12.   GENERAL   INSTRUCTIONS.   This   section   contains   organizational   maintenance procedures  as  authorized  by  the  Maintenance  Allocation  Chart  (MAC)  and  SOURCE,  MAINTE- NANCE   and   RECOVERABILITY   (SMR)   coded   items.   Maintenance   instructions   shall   reference or   contain   all   procedures   required   for   care   and   handling   of   the   air   conditioner. If  personnel  is  not  listed,  it  means  one  person  can  do  the  task. 4-13. TOP   COVERS,   AND   FRONT   LOUVERS/Inspect,   Service,   Replace This   Task   covers: a.   Inspect b.   Service c.   Remove d.   Replace e.   Installation INITIAL  SETUP Disconnect   Power Tools TOOL   KIT   (SC   5180-90-CL-N18) Adhesive   (Table   D-1,   Item   2) LOCATION/ITEM FABRIC   COVERS/METAL   COVERS Removal: 1.  Remove  three  screws  (1)  and three   lock   washers   (2)   which   secure fabric  cover  (3)  to  rear  cover  (5) and  remove  fabric  cover  from  housing. 2.   Remove   fourteen   screws   (4) from  rear  cover  (5)  and  remove  rear cover   from   housing. 4-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business