| |
TM 5-4120-377-14
Section II SERVICE UPON RECEIPT
4-2.
UNLOADING
The Model F18T4-2S and 3788 Air Conditioners are packaged in a container designed for shipment and
handling with the cabinet in an upright position. The base of the container is constructed as a shipping
pallet with provisions for the insertion of the tongs of a fork on materials handling equipment.
a. Remove all blocking and tie downs that may have been used to secure the container to the carrier.
b. Use a forklift truck or other suitable material handling equipment to remove the unit from the carrier.
Use care in handling to avoid damage to air conditioner. If an overhead lifting device must
be used, use appropriate sling so that weight of unit is borne by base of the shipping container.
Do not allow unit to swing while suspended from a lifting device. Failure to observe warning
may result in injury to personnel and damage to equipment.
4-3.
UNPACKING
a. General. Normally, the packaged air conditioner should
to be installed before it is unpacked.
NOTE
be moved into the immediate area in which it is
The shipping container is of such a design that it may be retained for reuse for mobility
purposes if frequent relocation of the air conditioner is anticipated.
b. Remove shipping container. Cut the metal bands that hold the top and sides of the container of the base.
Lift the container vertically and remove it from the base and cabinet.
4-2
Change 1
|