Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION SITE PREPARATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-4120-377-14 d.   Remove   pallet.   Attach   an   overhead   hoist   with   an   appropriate   sling   and   spreader   bar   to   the   lifting   handles provided   at   each   side   of   the   cabinet.   Raise   the   cabinet   and   remove   the   four   carriage   bolt   assemblies   that   hold the   tiedown   bars   to   the   pallet   from   the   underside   of   the   pallet.   Remove   the   four   bolts   that   hold   the   two   tiedown bars   to   the   unit   base.   Remove   and   retain   the   pallet   and   carriage   bolt   assemblies   and   the   tiedown   bars   and bolts,   if   reuse   is   anticipated.   Be   sure   to   remove   all   remaining   barrier   material   from   the   underside   of   the   cabinet base.   Lower   the   cabinet   to   the   floor   in   the   desired   position   and   remove   the   sling   and   hoist. NOTE Bolts used to anchor cabinet base to tiedown bars may be used to anchor it in place in installed location  if  installation  method  allows  for  anchoring  from  beneath. 4-4. RECEIVING   INSPECTION Perform  receiving  inspection  of  the  air  conditioner  in  the  following  manner: a.  Inspect  the  equipment  for  damage  incurred  during  shipment.  If  the  equipment  has  been  damaged,  report damage  on  DD  Form  6,  Packaging  Improvement  Report. b.  Check  the  equipment  against  the  packing  slip  to  see  if  the  shipment  is  complete.  Report  all discrepancies in accordance with the instructions of DA Pam 738-750. c.  Check  to  see  whether  the  equipment  has  been  modified. 4-5. INSTALLATION SITE PREPARATION a.  General.  The  air  conditioner  is  designed  so  that  it  is  adaptable  to  a  variety  of  installation  arrangements. Most typical installations are made by preparing an opening in an exterior wall of the room or enclosure to be conditioned  and  positioning  the  air  conditioner  so  that  the  front  of  the  cabinet  is  inside  the  room  or  enclosure and  the  back  outside.  Alternate  installations  may  be  made  with  the  entire  cabinet  either  inside  or  outside  the conditioned  area.  The  following  are  minimum  requirements  for  all  installations: (1) A relatively level surface capable of bearing the weight of the air conditioner on which to set the base. To insure proper condensate drainage, the surface should be level with 5° from front to back and side to side. See  figure  4-2,  sheets  1  through  4,  for  installation  dimensions. 4-4 Change 1