Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION INSTRUCTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-4120-377-14 4-11.  INSTALLATION  INSTRUCTIONS All  alterations  to  the  shelter  or  facility before   installation   of   air   conditioner. into  which  the  air  conditioner  is  to  be  installed  should  be  complete DO  NOT  LIFT  without  holding  unit  in  upright  position.  Otherwise,  unit  will  fall  over. a.  Attach  an  overhead  hoist  through  a  sling  and  spreader  bar  to  the  lifting  handles  on  each  side  of  the cabinet. b. c. d. Move  air  conditioner  into  position  and  aline  mounting  holes. Secure  unit  with  appropriate  mounting  hardware. Base -.4375-14 UNC (4 holes) Rear -.3125-24 UNF (3 holes) Seal  all  openings  around  cutouts  for  air  conditioner,  air  and  water  tight.  Use  gasket,  caulking,  or  other suitable   material. e.  The  air  conditioner  is  provided  with  four  drain  holes  in  base.  (See  figure  4-2.)  Remove  plugs  from  all drains   possible   for   most   complete   drainage   of   condensate   water.   If   water   from   these   drains   will   be objectionable or create a hazard, external overboard drains can be connected. Use standard 1/2-14 NPT male pipe  fittings  to  connect  base  drains.  Any  type  of  hose  or  tubing  may  be  used  as  a  drain  line.  The  drain  line should lead to an appropriate facility drain, storm sewer, dry sump, or an acceptable outside area. Be sure the entire  length  of  the  drain  line  is  at  the  same  height,  or  lower  than  the  base  to  ensure  gravity  drainage. f. Install a 10 AWG minimum ground wire between frame ground (FR-GND) on air conditioner cabinet and an adquate   earth   ground. g.  Fabricate  a  power  cable.  (See  para  4-13.) The  following  test  must  be  conducted  with  the  power  on.  Exercise  extreme  caution. Do  not  connect  P1  connector  to  air  conditioner  before  making  following  checks. h.  Connect  power  cable  to  a  208  volt,  3  phase,  400  hertz  power  source.  (See  para  4-12  and  figure  4-21.) (1)  Apply  power  to  power  cable. (2)  Use  a  multimeter  set  to  AC  voltage  range  of  at  least  250  volts  for  following  tests. 4-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business