TM5-4120-383-14
5-20.
EVAPORATOR
COIL.-Continued
(5) Discharge and purge the refrigerant system per paragraphs
5-11 and 5-12.
(6) Unwrap insulation on joints to be debrazed.
(7) Debraze tube connections at elbow and expansion valve
debrazing operations.
(8) Remove top two flat head screws that attach coil to
housing.
Remove side two flat head screws and two each screws,
lock washers, and flat washers that attach the mist eliminator
holder and coil to the housing.
When handling coils wear gloves to avoid cuts and
reduce fin damage on the coil.
(9) Slip evaporator coil and mist eliminator holder up and
out of unit.
b.
Replace.
If coil is defective replace it.
Installation.
c.
When handling coils wear gloves to avoid cuts and
reduce fin damage on the coil.
(1) Carefully position evaporator coil and mist eliminator
holder.
(2) Secure mist eliminator holder and evaporator coil to
housing with four flat head screws. Secure evaporator coil to
housing with two each screws, lock washers, and flat washers. The
four holes in the mist eliminator holder match the bottom four
holes in the coil.
(3) Align tubing connections to elbow and expansion valve.
Braze joints in accordance with paragraph 5-13. Take care that
expansion valve is protected during brazing operation.
(4) Replace dehydrator. (See para 5-30.)
(5) Leak test coil, dehydrator, newly brazed joints, and
joints in the area of newly brazed joints per paragraph 5-14.
5-47
|