|
|
TM 5-4120-386-14
Table 4-1. Organizational Preventive Maintenance Checks and Services (PMCS)-
Continued.
Q-Quarterly
W-Weekly
Equipment
Procedures:
Interval
Item to be
Item
is not ready/
Inspected
No.
W
Q
available if
Items loose,
Heaters
5
or wires or
elements are
damaged.
Disconnect air conditioner power supply before doing maintenance
work on the electrical system.
a.
Check for breaks in
wiring and insulation.
Tighten loose
connect ions.
b . Check heating elements
for damage.
4-9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |