|
|
TM 5-4120-386-14
4-17.
PANELS-Continued.
REMARKS
ACTION
LOCATION/ITEM
TOP OF HOUSING
(continued)
Clean dirty panels with warm, soapy
CLEANING
water.
[INSTALLATION
Secure thermostatic heater
a.
6. Center Top
switch bracket (7) to under-
Cover
side of cover (3) with
two screws (12).
b. Aline cover (3) and secure
with six screws (9).
Aline cover (2) and secure
7. Rear Top
with ten screws (10).
Cover
Aline cover (4) and secure with
8. Front Top
eight screws (8).
Cover
Aline fabric cover (1) and secure
9. Fabric
with three screws three, flat-
Cover
washers, and three lockwashers.
4-25
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |