TM 5-4120-386-14
Section VI PREPARATION FOR STORAGE OR SHIPMENT
4-41. STORAGE AND SHIPMENT.
This task covers:
a.
Storage
b.
Shipment
INITIAL SETUP
Special Tools
Materials/Parts
Tool Kit SC 5180-90-CL-N18
Safety glasses
Gloves
Sack, PPP-S-30, Type II (cushioned)
Cushioning material, PPP-C-843
Wood Box, PPP-B-601, Domestic Type
Strapping, QQ-S-781, Class I, Type I or IV, Finish A
Tape, PPP-T-97, Type III 1/2 inch wide, pressure sensitive
Fiberboard corner pads, MIL-STD-1186
Polyethylene film, minimum 3 mil thickness
4 bolts, 3/8-24 and washers
REMARKS
ACTION
LOCATION/ITEM
Storage
1. Short Term
a.
Disconnect power supply and remove
from shelter.
b.
Make sure unit is clean and dry.
Close all louvers and grilles.
c.
d.
Unroll canvas cover and snap into
place.
e.
Store in the operating (upright)
position.
a.
Disconnect power supply and remove
2. Long Term
from shelter.
Make sure unit is clean and dry.
b.
c.
Close all louvers and grilles.
d.
Unroll canvas cover and snap into
place.
Package all hardware, cable
e.
connectors, technical manuals, etc.
in a cushioned protective sack.
Staple shut and secure to unit.