|
|
TM 5-4120-386-14
5-26. CONDENSER COIL - Continued.
LOCATION/ITEM
REMARKS
ACTION
Replace dehydrator and.
See Para. 5-17.
e.
connect flare nuts.
f.
Leak test refrigeration
See Para. 5-13.
system.
Evacuate refrigeration system.
See Para. 5-14.
g.
h.
Charge refrigeration system.
See Para. 5-15.
Install clamps and screws to
i.
secure receiver tank, dehy-
drator, and liquid sight
indicator to housing.
Install condenser guard with
j.
screws and lockwashers
Reposition electrical wiring
k.
to original position and tie
as required.
1.
Install auxiliary power
receptacle J11 (35) and wiring
and secure to housing using
four screws (33), four lock-
washers (32) and four nuts
(21).
m.
Install clamp and mounting
hardware to the low side
suction line.
n.
Install Rear Top Cover.
See Para. 4-17.
5-87
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |