TM5-4120-387-14
(5) Using screwdriver, secure pressure switches (S6) and (S5) to enclosure
with two screws and lockwashers, each.
(6) Install enclosure and switches in unit.
(7) Aline the enclosure and switch nameplate with unit mounting holes.
(8) Using screwdriver, secure enclosure and nameplate with four screws.
(9) Carefully coil excess capillary tubing and tape in place to eliminate
vibration.
(10) Replace the dehydrator. (See para 5-13.)
(11) Leak test all newly connected joints and those in the repaired area.
(See para 5-9.)
(12) Evacuate and charge the refrigeration system. (See para 5-10 and
5-11.)
Follow-on procedure: 1. Install fan motor.
(See para 4-60.)
2.
Install condenser fan. (See para 4-59.)
3.
Install evaporator fan. (See para 4-58.)
4.
Install top panel.
(See para 4-23.)
5.
Press and release pressure switch reset buttons to be
sure they are not tripped.
5-17. CHARGING VALVES
Preliminary procedure: 1.
Remove service valves cover.
(See para 4-15.)
2.
Remove top panel.
(See para 4-23.)
5-36
|