TM5-4120-387-14
(8) Leak test all newly connected joints and those in the repaired area.
(See para 5-9.)
(9) Evacuate and charge the refrigerant system. (See para 5-10 and 5-11.)
Follow-on procedures: 1.
Install fan motor.
(See para 4-60.)
2.
Install top panel.
(See para 4-23.)
5-21. COMPRESSOR(B1)
Preliminary procedure: Remove junction box.
(See para 4-29.)
The compressor and motor assembly are hermetically sealed in a metal canister and
are not repairable.
The heater may be replaced without opening the refrigerant
pressure system.
a.
Preliminary Inspection/Test
(1) Electrically test the heater element, heater thermostat,
harness, and motor as follows.
(2) Disconnect wiring harness at connectors P3 and J3
compressor junction box).
w i r i n g
(located on the
Figure 5-18. Compressor Schematic
5-47
|