Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FLUID PRESSURE REGULATING VALVE (V2) CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

(5) Purge the system with nitrogen paras 5-7 and 5-8.) (6) Remove the receiver. c. Installation (1) Using wrench and screwdriver, lockwashers and nuts each on two receiver (2) Place the receiver on the tube TM5-4120-387-14 and debraze the tube connections. (See loosely secure receiver with two screws, clamps. ends, purge the system with nitrogen, and braze the tube joints. (See paras 5-7 and 5-8.) (3) Using a screwdriver, secure the two receiver clamps to the casing side panel  with  two  screws  and  lockwashers  each  clamp (4) Using screwdriver and wrench, tighten (5) Replace the dehydrator. (See para 5-13.) two clamps on receiver. (6) Leak test all newly connected joints and those in the repair area. (See para  5-9.) (7) Evacuate and charge the refrigerant system. (See paras 5-10 and 5-11.) Follow-on  procedure: Install junction box. (See para 4-29.) 5-69

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business