4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: SERVICE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
5-13. Evacuating Refrigerant System (cont)
5.
Start vacuum pump.
6.
Open charging manifold valves.
7.
Open both service valves.
8.
Run the vacuum pump until at least 29 inches of mercury, measured on the gage, is reached.
NOTE
Inability to reach 29 inches of mercury may indicate either a leak or a problem with
the pump.
9.
Continue running the pump for one more hour, while observing the gage. If the gage needle moves back and forth,
you have a leak which must be located and corrected first.
10. Close both unit service valves.
11. Close charging manifold valves.
12. Stop vacuum pump.
13. Disconnect pump from center hose connection.
14. Go to paragraph 5-14, charging the refrigeration system.
5-28 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business