4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Section II MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
Section II MAINTENANCE PROCEDURES
6-2. General. The only items restricted to intermediate general support maintenance level by the Maintenance Allocation
Chart (MAC) are to repair and replace elements of the air conditioner housing. However, intermediate general support
maintenance may be called upon, at times, to perform any or all of the MAC Items listed for unit and intermediate direct
support maintenance for rehabilitation or overhaul of an air conditioner.
6-3. Sheet-Metal Parts.
a.
Disassemble the air conditioner to the extent necessary to gain access to damaged area for repair.
b.
Remove insulation from area to be repaired. (See para 5-3.)
c.  Repair damage using standard sheet-metal repair procedures. Rivet or weld patches to the inside surface when
required.
WARNING
Toxic fumes are emitted by burning or overheated insulation. Heated refrigeration
piping can burst with explosive force.  Shield wiring and piping, and remove
insulation in the area if weld repair is necessary.
d.  Prepare surface for priming and painting, using wet abrasive paper to remove dead paint. Paint as directed in
TM 43-0139.
e.
Replace insulation as necessary and reassemble the air conditioner.
6-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business