Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REFRIGERATED CONTAINER SYSTEM SERVICE UPON RECEIPT Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 55-8145-221-14&P Change 1 0017 00-8 3 4 5 6 5 6 3 4 REFRIGERATED CONTAINER SYSTEM SERVICE UPON RECEIPT – Continued   0017 00 REFRIGERATION UNIT PREPARATION – Continued. 4.     Position refrigeration unit valves (open) as follows: a. Open both side condenser doors. CAUTION Using excessive force when opening or closing valves can cause damage to the valve seats. b.     Fully open both stop valves (1 and 2, figure 6). c. Remove two caps (3) and fully open two isolation valves (4).  Install two caps. NOTE The compressor shut off valves can be adjusted to three positions: fully closed to block the  refrigerant  tubes  and  isolate  the  compressor  and  service  ports,  fully  open  to  allow flow from piping to compressor but not the service port, or cracked (one turn closed from fully open) to allow flow from piping to compressor and service port on valve d.     Remove two caps (5) and fully open two shut off valves (6).  Install two caps. 1 2 99-6082-F5-WP0017 Figure 6.  Refrigeration Valve Setting for Normal Operation

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business