THIS WORK PACKAGE COVERS:
Removal, Inspection, Repair and Installation
INITIAL SET-UP:
Maintenance Level
Unit
Tools:
Material/Parts:
General Mechanics Tool Kit (Section III, Item 1, WP 0048 00)
Silastic Sealant (Item 3, WP 0078 00)
Forklift (Section III, Item 15, WP 0048 00)
Lock Washers (Item 32, WP 0078 00)
Personnel Required:
Equipment Condition:
Three (including forklift operator)
Generator Set Removed (WP 0021 00)
REMOVAL.
1.
Disconnect Refrigeration Unit power cable (1) from generator power cable (2).
2.
Open cable storage compartment door (3) and stow power cable (1). Close door (3).
CAUTION
Do not try to lift Refrigeration Unit with forklift while mounting hardware is still
attached. Do not extend forklift tines too far into Refrigeration Unit tine guides.
Refrigeration Unit and Container will be damaged.
3.
Position forklift tines in Refrigeration Unit (4) tine guides (5) so they can support the units weight when the mounting
hardware is removed.
4.
Open both side doors (6).
5.
Remove four nuts (7), lock washers (8) and flat washers (9). Discard lock washers.
6.
Raise the Refrigeration Unit (4) with the forklift just enough to take the weight off the mounting studs (10).
7.
Open right rear door (11).
8.
While pushing the Refrigeration Unit (4) from inside the container (12), remove the Refrigeration Unit from the front
panel (13).
9.
If the Refrigeration Unit (4) is not replaced immediately, install the cover plate (14) over the opening in front panel (13)
and secure with four flat washers (9), lock washers (8) and nuts (7). Cover plate is stored inside container when not in
use.
INSPECTION.
1.
Inspect mounting studs (1) for damaged threads.
2.
Inspect framing (2) around opening in front panel (3) for damage.
REPAIR.
1.
Replace damaged studs.
2.
Replace damaged framing (WP 0038 00).
|