| |
TM 55-8145-221-14&P
0035 00-8
REAR DOOR, LEFT Continued
0035 00
ASSEMBLY Continued.
5.
Apply a bead of sealant (Item 3, WP 0078 00) along edges of insulation retainer frames (18, 19 and 20), making contact
with door panel (2). Install retainer frames on door panel; secure with 34 screws (21).
6.
Apply a bead of sealant (Item 3, WP 0078 00) along edge of center frame (22), making contact with door panel (2).
Install center frame with sixteen screws (21).
7.
Install door seal (23) in insulation retainer frames (18, 19 and 20) with seam of seal over edge of retainers.
8.
Install two retaining strips (24) with 24 rivets (25) (Item 22, WP 0081 00).
9.
Install retaining clip (26) with 21 rivets (25) (Item 22, WP 0081 00).
|