| |
TM 55-8145-221-14&P
0040 00-1
FLOOR BOARD REPLACEMENT
0040 00
THIS WORK PACKAGE COVERS:
Removal and Installation
INITIAL SET-UP :
Maintenance Level
General Support
Tools:
Equipment Condition:
General Mechanics Tool Kit (Section III, Item 1, WP 0048 00)
Refrigeration Unit shut down (WP 0006 00)
Material/Parts:
Generator Set shut down (WP 0006 00)
Adhesive Sealant (Item 3, WP 0078 00)
REMOVAL.
1.
Open right rear door (1), then left rear door (2) of container.
2.
Remove 64 screws (3) from floorboard (4).
3.
Lift and remove floorboard (4) from floor panel (5).
4.
Remove old sealant from floor panel (5).
INSTALLATION.
NOTE
Floorboard must be installed so that brace is toward door opening.
1.
Apply a bead of sealant (Item 3, WP 0078 00) along floor panel (5) where outer edge of floorboard (4) rests and two
beads down the center where screw hole patterns run. Apply sealant around each floorboard mounting hole in the floor
panel.
2.
Position replacement floorboard (4) on floor panel (5). Make sure brace (6) is toward door opening.
3.
Install 64 screws (3) in floorboard (4).
4.
Close left rear door (2) first, then right rear door (1).
|