TM 55-8145-221-14&P
0045 00-1
FLOOR PANEL REPLACEMENT
0045 00
THIS WORK PACKAGE COVERS:
Removal and Installation
INITIAL SET-UP:
Maintenance Level:
Direct Support
Tools:
Material/Parts:
General Mechanics Tool Kit (Section III, Item 1, WP 0048 00)
Sealant Tape (Item 16, WP 0078 00)
Portable Drill (Section III, Item 2, WP 0048 00)
Sealant (Item 3, WP 0078 00)
Drill Bit Set (Section III, Item 2, WP 0048 00)
Sealant Tape (Item 17, WP 0078 00)
Torx Bit (Section III, Item 6, WP 0048 00)
Camtainer Bolt (Item 5, WP 0081 00)
Torx Socket (Section III, Item 7, WP 0048 00)
Foam, Urethane (Item 8, WP 0078 00)
Hoist (Section III, Item 14, WP 0048 00)
Camtainer Nut (Item 8, WP 0081 00)
Sling (Section III, Item 9, WP 0048 00)
Equipment Condition:
Personnel Required:
Front Panel removed (WP 0044 00)
Three
Drain removed (WP 0039 00)
Floorboard removed (WP 0040 00)
REMOVAL.
1.
Remove 23 bolts (1), fourteen screws (2), and zee plate (3) from floor panel (4) and container frame (5).
2.
Carefully pry zee plate (3) from container frame (5) and floor panel (4).
3.
Remove insulation (6) from space between floor panel (4) and container frame (5) at door opening.
4.
Using torx bit (Section III, Item 6, WP 0048 00) and socket (Section III Item 7, WP 0048 00), remove 138 camtainer
nuts (7) and bolts (8) from floor panel (4).
5.
Push up on floor panel (4) to break seal between panel and container frame (5).
__________
WARNING
Floor panel is heavy / difficult to handle (approximate weight is 450 lbs.). Use
appropriate hoist and sling when removing floor panel.
6.
Connect hoist (Section III, Item 14, WP 0048 00) and sling (Section III, Item 9, WP 0048 00) to floor panel (4).
7.
Remove floor panel (4) from container frame (5).
8.
Scrape old sealant tape (9) and sealant from container frame (5) and floor panel (4) sealing surfaces.
|