Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FLOOR PANEL REPLACEMENT Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 55-8145-221-14&P 0045 00-3 FLOOR PANEL REPLACEMENT – Continued 0045 00 INSTALLATION. 1. Peel backing from sealant tape (9) (Item 16, WP 0078 00), and apply along settling surfaces of container frame (5) and floor panel (4). __________ WARNING Floor  panel  is  heavy  /  difficult  to  handle  (approximate  weight  is  450  lbs.).    Use appropriate hoist and sling when installing floor panel. 2. Using hoist and sling, lower replacement floor panel (4) into container frame (5). 3. Center floor panel (4) on container frame (5). NOTE Replacement floor panel is supplied without holes for mounting hardware.  Panel must be drilled during installation. To aid alignment of floor panel mounting holes with container frame, install one fastener in each side of floor panel before drilling remaining mounting holes. 4. Drill  one  13/32-inch  hole  up  through  each  side  of  the  floor  panel  (4).    Use  existing  holes  in  container  frame  (5)  as  a template. CAUTION To prevent water leaks,  camtainer  bolts  must  be  installed  so  that  bolt  head  is  on outside of container frame. 5. Using torx bit (Section III, Item 6, WP 0048 00) and socket (Section III, Item 7, WP 0048 00), install four  camtainer bolts (8) (Item 5, WP 0081 00) and nuts (7) (Item 8, WP 0081 00), one in each side floor panel (4). 6. Using container frame (5) as a template, drill remaining mounting holes up through floor panel (4). 7. Install remaining 134 camtainer bolts (8) (Item 5, WP 0081 00) and nuts (7) (Item 8, WP 0081 00) in floor panel (4). 8. Apply sealant (Item 3, WP 0078 00) around inside surface of screw holes on zee plate (3). 9. Position zee plate (3) against floor panel (4) and container frame (5). 10.   Install fourteen screws (2) through zee plate (3) into container frame (5). 11.   Using portable drill (Section III, Item 2, WP 0048 00) and No. 9 drill bit (Section III, Item 2, WP 0048 00), drill screw holes into floor panel (4), using existing holes in zee plate (3) as a template. 12.   Install 23 bolts (1) through zee plate (3) and into floor panel (4). 13.   Install front panel (reference WP 0046 00).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business