TM 55-8145-221-14&P
Change 1
0006 00-18
OPERATION UNDER USUAL CONDITIONS Continued
0006 00
OPERATING PROCEDURES Continued.
2.
NORMAL Shutdown, generator set (Figure 15).
a. Open control panel door (1).
b. Place AC CIRCUIT INTERRUPTER switch (2) in OPEN position.
c. Allow generator set to operate five minutes with no load applied.
d. Place MASTER SWITCH (3) in OFF position.
e. Perform all AFTER OPERATION (A) PMCS requirements in accordance with TABLE 7.
3.
EMERGENCY STOPPING GENERATOR SET. Depress EMERGENCY STOP pushbutton (4).
FUEL LEVEL
BATTERY CHARGE
E
F
1/2
FUEL
COOLANT TEMP
OIL PRESSURE
MASTER SWITCH
PRIME & RUN
AUX FUEL
START
OFF
PREHEAT
ENGINE
TOTAL HOURS
EMERGENCY
STOP
PUSH
TO STOP
OFF
OPEN
BATTLE SHORT
VOLTAGE
POWER
ON
OFF
ON
CLOSED
PERCENT
RATED
CURRENT
AC
VOLTS
VIEW ROTATED
90 CCW
CONTROL PANEL SHOWN OPEN
HOBBS
QUARTZ
PRIME
& RUN
AC CIRCUIT
INTERRUPTER
PANEL
LIGHTS
PRESS
TO RESET
100
140
180
240
0
80
40
PRESSURE
AMPERS
D.C.
0
-10
+10
+20
CHARGE
DISCHARGE
55
HERTZ
60
65
70
0
25
50
75
100
125
130
60 HERTZ
100
140
180 220
260
300
3
AM-VM
VOLTS
PHASE
L3-L1
3
L3-L0
1
1
3
2
4
Figure 15. Refrigerated Container, Shutdown Operating Procedures, Generator Set
|