|
|
TM 9-4110-241-13
TO 35E9-274-1
Table 2-1. Preventive Maintenance Checks and Services (PMCS) (Cont)
B - Before Operation
D - During Operation
W - Weekly
M - Monthly
Item
Interval
Item To Be Inspected.
Equipment is not
No.
Ready/Available if:
BDWM
Procedures
Power Receptacle
10
Power receptacle is damaged.
(Models AA600PF, AA1200PFA, and
AA4000PF).
Check for cracks, damaged pins or cover,
and loose or missing hardware.
Male Receptacle, Cap and Chain
11
Cap and chain are missing; male
(Models MDS1600N, TKR400C,
receptacle terminals are dam-
and TKR4000C).
aged or signs of scorching and
Check for missing cap and chain. Un-
shorts are evident.
plug cap and check male receptacle for
dust and dirt accumulation, bent or dam-
aged terminals, and signs of scorching or
shorts.
CHANGE 1 2-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |