Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Removal.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 4-23.  FUSES F1 AND F2 TESTING AND REPLACEMENT. - Continued b. Removal. (1)   Be sure power has been disconnected at the source and remove two bolts (1) and lock washers (2). Open control panel (3). Discard lock washers. NOTE One each 15 amp and 30 amp fuse is used. (2)   Note location and remove two fuses (4) and (5). NOTE Terminal hardware is supplied with fuse block. (3)   Tag wire lead terminals (7) and remove four screws (8), lock washers (9), and wire lead terminals. (4)   Remove two screws (10) and fuse block (6). c. Installation. (1)   Install fuse block (6) and two screws (10). (2)   Using tags and wiring diagram (fig. 1-4), install wire lead terminals (7), four lock washers (9), and screws (8). Remove tags. (3)   Install two fuses (4) and (5) in location noted during removal. (4)   Close control panel (3). Install two new lock washers (2) and bolts (1). NOTE FOLLOW-ON MAINTENANCE: Unlatch and close control panel cover door. Connect battery (para 4-35) and put unit back into service. 4-60

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business