Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-32. CONTROL TRANSFORMER T1 TESTING AND REPLACEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 4-32. CONTROL TRANSFORMER T1 TESTING AND REPLACEMENT. This task covers: a. Testing b. Removal c. Installation INITIAL SETUP: Materials/Parts: Equipment Conditions: Lock Washers (2) Refrigeration unit shut down (para 2-7) and battery 1, Appendix G disconnected (para 4-35). Self Locking Nuts (2) Control panel cover door raised and latched. 8, Appendix G Marker tags (2) 7, Appendix E a. Testing.  (See Figure 1-4.) (1) Be sure battery has been disconnected and remove two bolts (1) and lock washers (2).  Open control panel (3).  Discard lock washers. Figure  4-26.  Control Transformer T1 (2) Tag and disconnect wire leads (4). (3) Using  multimeter  set  to  measure  continuity,  check  control  transformer  (5)  continuity  between terminals 1 to 2 and 5 to 8.  Continuity should be indicated.  If no continuity was indicated, replace control transformer. (4) Check continuity between either terminals 1 to 5, or 1 to 8.  No continuity should be indicated.  If continuity was indicated, replace control transformer. 4-81

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business