TM 9-4110-257-14
5-23.
METAL HOSE ASSEMBLY (DISCHARGE) REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Conditions:
Refrigeration system discharged (para. 5-7) and purged (para. 5-8).
Right side condenser door open.
a.
Removal.
Purge (para. 5-8) and de-braze (para. 5-9) two fittings (1) and remove metal hose assembly (2).
Figure 5-19. Metal Hose Assembly
b.
Installation. Install metal hose assembly (2), purge (para. 5-8) and braze (para. 5-9) two fittings (1).
NOTE
FOLLOW-ON MAINTENANCE:
Close right side condenser door.
Replace dehydrator (para. 5-14).
Leak check (para. 5-10), evacuate (para. 5-11), and charge (para. 5-12) the refrigeration system.
5-48
|