| |
TM 9-4110-257-14
5-35. EVAPORATOR COIL REPLACEMENT.
This task covers:
a.
Testing
b.
Removal
c.
Installation
INITIAL SETUP:
Materials/Parts:
Equipment Conditions:
Lock Washers (12)
Refrigeration system discharged (para 5-7) and purged
1, Appendix G
(para 5-8).
Evaporator coil guard removed (para 4-18).
a.
Removal.
(1)
Loosen flare nut (1) and move copper tubing (2) to the side being careful not to kink or bend tubing.
Figure 5-31. Evaporator Coil
5-68
|