Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: (2) Sight Glass.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 5-38.  COMPRESSOR B1 TESTING, SERVICE, REPAIR. AND REPLACEMENT. - Continued NOTE Valve plate, suction valves, position springs, and dowel pins may come off when removing cylinder head. (d)   Remove eight screws (7), cylinder head (8), and cylinder head gasket (9). Discard cylinder head gasket. (e)   Remove four screws (10), lock washers (11), two discharge valve stops (12), and discharge valves (13). Discard lock washers, discharge valve stops, and discharge valves. (f) Install  two  screws  (10),  without  lock  washers  (11),  into  the  outermost  discharge  valves  (13)  mounting holes to act as jackscrews to release valve plate (14). (g)   Remove valve plate (14), valve plate gasket (15) two suction valves (16), position springs (17), and four dowel pins (18).  Discard valve plate, valve plate gasket, suction valves, and position springs. (h)   Remove any gasket material from all machined gasket surfaces and install four dowel pins (18), two new position springs (17) contacting on the ends and bowed out in the middle, new suction valves (16), new valve plate gasket (15), and new valve plate (14). (I) Check that suction valves (16) do not bind on valve plate gasket (15) by gently pushing on suction valve through intake hole in valve plate (14).  Adjust valve plate gasket as necessary to prevent suction valve binding. (j) Install two new discharge valves (13), new discharge valve stops (12), four new lock washers (11), new screws  (10),  new  cylinder  head  gasket  (9),  cylinder  head  (8),  and  eight  screws  (7).    Torque  screws  to between 40 and 55 ft-lb (54 and 75 Nm). (k)   Replace dehydrator (para 5-14).  Leak check (para 5-10), evacuate (para 5-11), and charge (para 5-12) the refrigeration system. (2)  Sight Glass. (a)   Discharge the refrigeration system (para 5-7). (b)   Remove sight glass (20) and gasket (24).  Discard gasket. (c)   Remove any gasket material from all machined gasket surfaces. Install new gasket (24) and sight glass (20). Torque sight glass to between 35 and 50 ft-lb (48 and 68 Nm). (d)   Replace dehydrator (para 5-14). Leak check (para 5-10), evacuate (para 5-11), and charge (para 5-12) the refrigeration system. (3)  Oil Pump. (a)   Discharge the refrigeration system (para 5-7). (b)   Loosen flare nut (25) and carefully pull tube (26) away being careful not to bend or kink tube. (c)   Remove adapter (27). 5-80

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business