Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-8. PRELIMINARY ADJUSTMENT OF EOUIPMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 e. Check and adjust V-belts as necessary (para 4-38). CAUTION Using  excessive  force  when  opening  or  closing  valves can cause damage to the valve seats. f. Refrigeration  System  Valves.  The  refrigeration  system  has  been  pumped  down  and  the  valves  must  be properly positioned before operating the refrigeration unit. (1) Fully open both stop valves (1, fig. 4-4) and (2). (2) Remove two caps (3) and fully open two isolation valves (4). Install two caps. NOTE The compressor shut off valves can be adjusted to three positions, fully closed to block the refrigerant tubes and isolate  the  compressor  and  service  port,  fully  open  to allow flow from piping to compressor but not the service port,  and  cracked  (one  turn  closed  from  fully  open)  to allow flow from piping to compressor and service port on valve. (3) Remove two caps (5) and fully open two shut off valves (6). Install two caps. g. Close both side condenser doors and both front bottom doors. 4-8.  PRELIMINARY ADJUSTMENT OF EOUIPMENT. a. Open control panel cover and secure open with door holder clips. b. Remove two bolts (1, fig. 4-5) and lock washers (2). Open the control box cover (3). Discard lock washers. 4-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business